Roofing

Pine Forest High School Re-roofing

Location: Fayetteville, NC

Size: 94,600 sq ft

Client: Cumberland County Schools

Contractor: T.R. Driscoll, Inc.

Budget: $665,000

The project consisted of a complete tear off of the existing roof system and replacement with a new three-ply asphalt built-up roof with gravel surface.  A new secondary drainage system was provided using scuppers located in the parapet walls.  The roof slope was built into the structure, eliminating the need for tapered insulation.  Crickets were located throughout the roof area to direct water to the primary roof drains.