This industrial project included a cast-in-place concrete foundation and containment for ten new 50-foot tall storage silos as well as a two-truck loadout. The loadout required a steel bridge for personnel to access the top of the trucks and 13,000 square feet of paved area designed for H-20 loading. Additionally, a custom 50-foot structural steel stair tower and OSHA compliant platforms at the top of the tank were designed to allow plant personnel to access the top of the silos.