The 5,200 square foot fines building is constructed using structural steel over a cast-in-place foundation. Aggregate pier soil improvement was utilized due to the poor in-situ soil conditions. The building and foundation design were intricately detailed due to the requirement for truck access, product unloading, and product movement throughout the building.