Fleming & Associates was hired as the prime consultant to design a new $25,000,000 extraction plant which includes a three-story extraction building, offloading and fines processing building, and boiler building and control room. The extraction building required close coordination with the equipment manufacturer with regards to equipment support, equipment access locations, and conveyor support.